Gie bridge – Ninh Binh Expressway Project, Package No.6 (Km 248+000 – Km255+500)

Total contract value: VND 934 billion

Start work       : September 11st  2007

Finished          : December 28th, 2012

Employer         : Viet Nam Expressway Corporation (VEC)

Construction scale:

Construction of 11.9Km 04- traffic lanes and 2 emergency lanes highway with asphalt concrete pavement.

New construction of 2 bridges: An Lac bridge with PC hollow slab girder (27m+4 x 33m+27m), 40 x 40 driven pile foundation. Bored pile D=1.2m – 1.5m and My Do bridge with PC-I girder  L= 33m, span structure 5x33m; Solf soil treatment by sand drain and PVD.

Construction of interchange, toll and culverts

The work is constructed in Nam Dinh province, Vietnam

 

07/10/2013

GENERAL INTRODUCTION

After a long period of growing and developing, CIENCO5 has now become a leading infrastructure construction Corporation performing in: building roads & bridges, irrigation, hydroelectric plant; investment in new town, industrial zone; reconnaissance, design & consult about transportation, civil and industrial works
 

 

GENERAL INTRODUCTION

After a long period of growing and developing, CIENCO5 has now become a leading infrastructure construction Corporation performing in: building roads & bridges, irrigation, hydroelectric plant; investment in new town, industrial zone; reconnaissance, design & consult about transportation, civil and industrial works
 

 

 

Head office: 77 Nguyen Du street, Hai Chau District, Danang City
Tel: 0236.3894414  Fax: 0236.3894420
www.cienco5.vn - info@cienco5.vn

 

Head office: 77 Nguyen Du street, Hai Chau District, Danang City
Tel: 0236.3894414  Fax: 0236.3894420
www.cienco5.vn - info@cienco5.vn